Launching the Global Platform for Sustainable Natural Rubber

Natural rubber is a crucial element of tire production and one reason Tire Industry Project (TIP) members want to ensure the sustainable production and supply of natural rubber.

Share This Post

Sustainable natural rubber, a Tire Industry Project priority

This, of course, means looking after the people, communities and natural resources touched by natural rubber production and supply – which all stand to benefit from the creation and adoption of sustainable practices and businesses.

TIP leading change

The tire industry consumes around 70 percent of natural rubber in the world and demand for natural rubber is growing, which throws into sharp relief the various social, economic and environmental opportunities associated with the production of this important commodity.

Together with other stakeholders, TIP members are working to transform the natural rubber supply chain for the better in developing the Global Platform for Sustainable Natural Rubber (GPSNR) – an independent platform to lead improvements in the socio-economic and environmental performance of the natural rubber value chain.

An ambitious and wide-reaching set of priorities

Twelve months of stakeholder collaboration have resulted in development of an ambitious, wide-reaching, common set of priorities for the natural rubber supply chain. The GPSNR will work to harmonize standards to improve respect for human rights, prevent land-grabbing, protect biodiversity and water resources, improve yields, and increase supply chain transparency and traceability.

Mainstreaming for meaningful change

A review of comparable supply chain sustainability initiatives revealed that the mainstreaming of good practices is linked to the delivery of meaningful change at the global level. This is something that requires actionable commitment from the entire supply chain, and numerous different stakeholder groups have important roles to play. In the case of natural rubber, this includes tire manufacturers and other natural rubber-using industries (such as those producing rubber gloves, condoms and other engineered products), natural rubber suppliers and processors, representatives of individual smallholder producers, vehicle manufacturers, and non-governmental organizations.

Binding commitments

A chain is only as strong as its weakest link; it is in the interest of the entire supply chain to ensure sustainable standards are met and maintained. The GPSNR will have clear membership criteria and supply chain standards that members must commit to maintain effective involvement. Members of the GPSNR will undertake binding commitments, and the GPSNR will constructively address failures to honor those commitments and act decisively in the event of noncompliance with remedial measures.

Industry backed, collaboratively driven

TIP has spearheaded development of the GPSNR and will provide initial support for the platform during its first two years of start-up and operation. This necessary level of support ensures basic operations during the establishment of a paying membership base. From launch, the platform will be independently managed with governance and decision making overseen by a representative group of stakeholders.

TIP has employed a truly collaborative effort to ready the GPSNR for launch, and that spirit of collaboration will define the actions of the platform going forward. TIP is confident that the diverse interests, experiences, areas of expertise, and motivations represented within the GPSNR will combine to deliver a successful, sustainable natural rubber supply chain.

Join the platform

If you are a natural rubber stakeholder and would like to learn more about the GPSNR and membership opportunities, please contact stefano.savi@gpsnr.org

More To Explore

News

GPSNR Working Groups Update: October 2024

Assurance Model Task Force: The Executive Committee (EC) has reviewed the Assurance Model documents and approved them to be submitted to the General Assembly for a vote. The EC has also identified several topics that will require further discussion and finalisation next year. These include minimum requirements, the mechanism for third-party oversight of assessor accreditation, the format and content of assessment result disclosures, the process for assigning third-party assessors, claims, refinements to the classification system for major non-conformities, and a risk-based approach to assessment scheduling. These topics will be presented for a vote at the 2025 General Assembly. For further context, here is the link to the compilation of feedback on the Assurance Model documents received since June, along with responses and changes made based on these comments: https://rubberplatform.sharepoint.com/:b:/s/GPSNRMembers/EWLmS86xDkxMtce9wKEuLjwByB6hU_QXrROu_XJ9DuK0kA?e=ZYYike

Additionally, the EC has agreed that the first three years of assessments (2027-2029) will be conducted annually, with mandatory public disclosure of a category-level summary of the assessments, while company-level disclosure will be optional for those being assessed.

 

Smallholders Representation and Capacity Building (SCB) Working Group: 18 members from Ghana were approved this month, with an onboarding call held on 10 October 2024. Additionally, the EC Election Campaign call for smallholders took place on 29 October 2024.

Koltiva submitted the final report for the Indonesia GAP Coaching Project (Phase 2) and delivered a final presentation on 17 October 2024. The third phase of the Indonesia GAP Coaching Project is now underway and is currently in the preparation stage. For the Thailand GAP Coaching Project, Koltiva presented the first full-year project results on 22 October 2024. Meanwhile, RAFs completed training for 1,000 farmers ahead of schedule in the Thailand Agroforestry Project. Furthermore, a curated content list and promotional poster for Rubber Wiki have been created to engage smallholders through the Knowledge Sharing Platform.

Looking ahead, a Pre-GA Webinar for smallholders is scheduled for 18 November 2024, and 10 new Cambodian smallholders have applied for membership and are awaiting approval.

For Capacity Building Projects, SCB WG members are requested to review and provide feedback on the final report for the Indonesia GAP Coaching Project (Phase 2) by 28 October 2024. Koltiva will also submit agricultural calendars and training materials for the third phase of this project for SCB WG review by the same date. For the Thailand GAP Coaching Project, Koltiva is revising the full-year review report based on feedback from SCB WG members. Additionally, the Project Management Subgroup will hold its kick-off meeting on 23 October 2024.

 

Shared Responsibility Working Group: The Shared Investment Panel (SIP) has officially been established following approval from the GPSNR Executive Committee.

The Secretariat is continuing to support the implementation of the Shared Investment Mechanism, with the Project Management Subgroup currently reviewing the proposals received. The SIP will select its co-chairs and plans to hold its kick-off meeting early next month.

Regarding the Value Transfer mechanism, the Executive Committee will form a task force with one representative from each ordinary member category. This task force will work on the next steps to finalise a revised proposal, with the aim to present it at the in-person meeting in February 2025.

News

GPSNR Working Groups Update: September 2024

Assurance Model Task Force: As we approach the General Assembly in 2024 where the Assurance Model will be put up for voting, the taskforce is meeting regularly to discuss comments and incorporate comments from the second public consultation which is currently ongoing. This consultation focusses on feedback on Assessment Checklist, Assurance Protocol and Remediation Protocol, and will be accepting comments till 27 September 2024.  You can access the documents here and provide feedback here

 

Smallholders Representation and Capacity Building (SCB) Working Group: To operationalise projects with the funds collected from the Shared Investment Mechanism, the working group is setting up a project management subgroup to help in reviewing and monitoring projects under the SIM. The TOR is available here, and interested members should email cheewei@gpsrn.org by 11 October 2024. 

Additionally, Smallholders from all GPSNR member countries have nominated representatives for two positions following internal discussions within their countries: the Shared Investment Panel and the Project Management Subgroup. The final international voting is anticipated to conclude by the end of September 2024.

 

Shared Responsibility Working Group: The nominations for voting seats for the Shared Investment Panel are now open. Five voting seats will be allocated to manufacturers, while four voting seats will be reserved for non-manufacturers. To ensure equitable representation, each eligible member category will nominate one member to take up a voting seat.  All GPSNR member categories are currenting discussing this internally and will choose a nominee by October 2024. Please reach out to your EC representative for more details if you are not already in the discussions. 

Please note that nominees should ideally not submit capacity-building proposals this year, as they would need to recuse themselves from voting. If a category is unable to reach an agreement on a nominee, all seats will be opened for self-nominations from any member, regardless of category. In this case, the Executive Committee will vote to decide the final allocation of seats, which may result in multiple seats being held by members of the same category. 

Scroll to Top