(CLOSED) Request for Proposal – GPSNR Assurance Models Review

Share This Post

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define GPSNR strategy and objectives.

Through a process led by the Strategy and Objectives Working Group the Platform has developed stated goals that support a strong focus on developing a framework that supports and sustains sustainability claim in the supply chain.  Important among the tools to do this is development of an Assurance Model that is credible and smoothly functioning.

In order to achieve this, the Platform is seeking a fixed term consultancy to develop a robust review of the options for various Assurance Models that will support the desired outcomes of the Platform. 

The Working Group considers the discussion regarding options for an Assurance Model shall include review and discussion of the structure that will provide a credible claim of participation and progress toward the goals of the organization.  It may also provide required activities, methodologies and time frames along with options for verification models.  Another important component of an assurance model focuses on the discussion of disclosure of progress and results to support transparency in actions that will allow credible claims of progress.

The following submission guidelines & requirements apply to this Request for Proposal:

Proposals will only be accepted from individuals or firms with experience relevant to this project.

Examples of previous relevant work should be provided as well.

A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.

A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.

Proposals must be signed by a representative that is authorized to commit bidder’s company.

Proposals must be received prior to 15th September to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.

GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with, and will make an award to one of these “down-selected” individuals or firms.

GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Download full Request for Proposal here: GPSNR-RFP-A02-001

More To Explore

Request For Proposal – GPSNR-RFP-C03-036-Review and support the development of a Central Repository

Introduction & Background
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include rubber products manufacturers, natural rubber suppliers and processors (PPTs), end users, smallholders, and civil society organisations. 

The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only.  Traditionally tracing each companies supply chain takes on an individualistic approach due to the sensitive nature of the data. However, to expedite the enhancement of traceability in view of EUDR, the SG has decided on a collaborative approach by developing a Central Repository. 

The Central Repository functions as a database for storing polygons and supply chain information contributed by individual members. It will also link the smallholders, PPTs and manufacturers on a single platform while reducing duplicated mapping efforts between different manufacturers. The Repository should allow for easy extraction of information for GPSNR’s Due Diligence System and be integrated with the EU information system. Moreover, the repository should either integrate different Risk, Traceability and Deforestation mapping tools or have the data formatted in a way that allows for seamless input into the tools. 

In addition, considering the sensitive nature of individual companies’ supply chain information, the platform must implement various layers of access control. This will ensure that each manufacturer can only access information pertaining to their own supply chain. Furthermore, the repository should have distinct tiers of users, including end users, manufacturers, PPTs, and smallholders, with each tier granted access privileges relevant to their role.

Objectives and Scope of Work/ Deliverables
GPSNR expects the consultant to deliver the following:

  1. Craft a database that stores polygon and supply chain information to the plantation level and allows for the upload of geo-mapping information. 
    1. The database should also have an online dashboard view of mapped / Mapping-in-progress farmlands, contract/seller invoice information – outstanding and shipped)

  2. The Central Repository should allow data to flow to and from or store data in a way that is compatible for the uses below:
    1. Traceability tool providers (Eg – Koltiva, TRST01, Harmuni (Agridence etc))
    2. Deforestation mapping tools (Eg – LiveEO, Satelligence, Starling etc)
    3. Risk assessment systems/tools (Eg – ASI Tool or Others as available etc)

  3. Create levels of access authorizations for different accounts within the platform – 
    1. User accounts for uploading geo mapped data
    2. Access to viewing the geo-mapped data linked to user accounts for the PPTs and Manufacturers
      1. Users should only have access to information from within their own supply chains or information that they input to the repository
      2. Users should be able to form links across different tiers. For example, users should be able to form links between smallholders and PPTs, PPTs and manufacturers. 
      3. When there are several members which require access to geo mapped data from one user, the platform should have the ability to extend access authorization to multiple users.
    3. Extracting information from Due Diligence Systems and integrating it with the EU Information System (this should be limited to manufacturers only)

  4. The platform should be compliant with applicable data privacy norms and regulations which include but are not limited to the GDPR and PDPA.

  5. A fee structure including management of shared cost arising from overlapping access to geo mapped data.

  6. Data protection and cyber security policies

  7. Service Level Agreements including downtime, maintenance, customer support and service, updates.

  8. Data Backup

  9. Server location – Singapore (Preferred)

  10. A timeline for development of the Central Repository (milestones with details)

  11. Optional – Deforestation monitoring tool integrated with central repository and the applicable fee structures

Proposal Format and Contents
The proposal should include the following:

  1. A workplan that outlines all key activities of the deliverables (as outlined in Expected Deliverables above)
  2. Timeline and key stages of operations (based on Project Timeline below) 
  3. Budget, including detailed breakdown of expected manpower, logistics, and costs 
  4. Description of past work and technical expertise that is relevant to this RFP
  5. A list of project team members with their roles in the project and associated qualifications.

Submission Guidelines & Requirements 
The following submission guidelines & requirements apply to this Request for Proposal: 

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project. 
  2. Examples of previous relevant work should be provided as well. 
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project, a cost breakdown, and daily rates and an estimated total number of days. 
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company. 
  6. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration. 
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic. 

Project Timelines 

RFP Published

4 Sep 2023

Proposal Submission Deadline

25 Sep 2023

Contract Awarded

9 Oct 2023

First consultation with Manufacturer’s Subgroup 

23 Oct 2023

Bi-weekly progress updates

23 Oct – 18 Dec

Final Report + Deliverable submission

19 Dec 2023

Budget
The Platform will review budget proposals from service providers and the budget will comprise an important part of awarding the contract.

Payment terms shall be:

  • 20% at the signing of the contract
  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
  • 40% on go-live 
  • Balance 10% – 1 month after go-live

Evaluation Factors
GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Responsiveness to the requirements set forth in this Request for Proposal
  2. Relevant past performance/ experience
  3. Samples of work
  4. Cost, including an assessment of total cost of ownership
  5. Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.


View RFP Document here

(CLOSED) Request for Proposal – Grievance Mechanism Review

The Global Platform for Sustainable Natural Rubber is an international, Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOS of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

Through GPSNR’s Working Groups and the Executive Committee, the Platform is developing an Assurance Model that is intended to be credible and smoothly functioning. Underlying this Assurance Model, and to ensure its effective implementation, is the need for a mechanism by which Members and non-members may take grievances they have against a Member for non-conformance with the Platform’s requirements, which may arise from non-conformance with standards, the Code of Conduct, Conflict of Interest Policy, or other requirements of Members and allow those complainants to have their grievance be heard and resolved (“Grievance Mechanism”).

Under its authority and duty to create a Compliance System for the Platform under Section 10.d. of the Platform’s statutes, the Executive Committee seeks recommendations on the organization and process for such a Grievance Mechanism that allows for the intake, an initial, professionally mediated resolution process, and, finally, the process by which it is submitted to a formal Complaints Panel for resolution in the case that mediation does not work. That recommendation would be in accordance with the engagement outline below and based on a comparative study of best practices in grievance mechanisms for similar multi-stakeholder initiatives.

Understanding that the Platform is in its early stages, and therefore has limited resources, the recommendation should strive for a lean model while maintaining consistency with the policies of the Platform (e.g., Conflict of Interest Policy). Although lean, the Platform also recognizes the need for a process that is accessible, impartial, timely, transparent, and affords protections, such as anonymity, to the complainant (where needed). Developing the Grievance Mechanism is expected to be an iterative process.

The consultant is to develop, in consultation with the GPSNR Executive Committee and Secretariat, a Grievance Mechanism in the form of a process flowchart and a set of rules governing the process for receiving, assessing, processing, and escalating grievances through a series of steps to find an agreeable and just solution. The consultant should adhere to the following phased, iterative approach:

  • Phase I – Comparative Review of Grievance Mechanisms for Similar Multi-Stakeholder Initiatives
  • Phase II – Process Flowchart/Outline
  • Phase III – Final Recommendation

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 13th of December to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.
  7. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with and will make an award to one of these “down-selected” individuals or firms.
  8. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Download full Request for Proposal here

Attachement A -will be shared upon submission

Attachement B- will be shared upon submission

Scroll to Top