Smallholders Representation Working Group Update – February 2020

The Smallholders Representation Working Group will soon actively engage our smallholder members in several sessions with the aim of thoroughly briefing them on the Platform’s operations, including key documents such as GPSNR Statutes and Code of Conduct.

Share This Post

These documents have now been translated into several languages to cater to the geographical diversity of the group. Ensuring that the smallholders have a good foundational understanding of GPSNR’s aims, structure and bodies of the Platform and the roles of those bodies, is key to inclusion and participation. 

A sub-Working Group has been specially established to focus on preparations for the General Assembly and related sessions. The sub-Working Group will have its first session in early March, and will discuss matters such as agenda, potential facilitators, translation services, as well as plans to hold two half-day orientation sessions with the smallholders prior to the General Assembly. 

Due to the ongoing coronavirus situation, the Working Group will revise its timeline for continuing its plans to organize smallholder workshops in additional countries like India and Malaysia. Up for consideration is a partnership with the Capacity Building Working Group on possible short-term projects that can be implemented in the meantime.

More To Explore

GPSNR Working Groups Update: September 2023

Strategy and Objectives Working Group:
The Traceability Pilot Field Trials consortiums Agridence and Koltiva have presented the final reports, which have been distributed within the Risk Subgroup. 

The Risk Subgroup has extended an invitation to ASI to share the formula behind the Risk Assessment Framework. This ensures that the framework is malleable to fit the dynamics of the Natural Rubber Industry. 

Furthermore, the Risk Subgroup has solidified plans for an initial pilot trial in collaboration with ASI, focusing on the establishment of Indonesia’s national risk assessment.

The resolution for the Assurance Model has been finalised and is currently in circulation among the wider membership for voting. The Member’s Journey Model and Assurance Model Timeline are slated for voting at GA 2023. The following items have been included in the Resolution as a strong basis for future consultations and discussions following GA 2023: Shared Investment Mechanism, Assurance Model Framework, and KPIs.

The Risk Subgroup is awaiting proposals from the Basel Institute in addressing corruption within Rubber Supply Chains from the ASI Risk Tool, Reporting Requirements and doing a qualitative corruption data analysis. 

Furthermore, the Risk Subgroup anticipates developments in the Assurance Model in December 2023, before proceeding with the expansion of the Risk Tool and the pre-setting of national risk levels. This ensures that the Risk Tool is not developed in silo and is in alignment with the other components of the Assurance Model.

Lastly, the Risk Subgroup intends to conduct an analysis of the Risk Tool with the Policy Framework to further understand how granular should Risk Assessment reach. For example, is Risk Assessment sufficient on a theme level or would it be necessary to deep dive into the Policy Component level.  

Smallholders Representation and Capacity Building (SCB) Working Group:
The Thailand Agroforestry subgroup conducted a KPI workshop before the Agroforestry training in October 2023. The subgroup is gearing up to conduct the inaugural set of Agroforestry training sessions, benefiting 100 farmers in Songkhla in October 2023.

Additionally, a productive knowledge exchange session took place involving the Agroforestry-Income Diversification task force, Pak Febrius, and the Thailand Agroforestry Subgroups.

Meanwhile, the Thailand GAP subgroup successfully finalised a contractual agreement with Koltiva and will hold its kick-off meeting, marking the first meeting since the start of the project.

The HCSA-HCVN Field Trials task force presented its final report to the SCB WG for endorsement.

The Digital Knowledge Sharing Platform (KSP) task force has conducted two pre-pilot development meetings and the Rubber Wiki app was officially launched on the Google Play Store. The task force is planning a training session tailored for task force and secretariat members, focusing on the effective management of Rubber Wiki. Following the app’s official launch, the KSP contractor will organise group socialising events in Indonesia and Thailand, aimed at introducing the app and gathering valuable user feedback.

Lastly, the SCB WG is gearing up for both national and international calls with smallholder members, an essential part of the preparations leading up to GA2023.

Policy Toolbox Working Group:
During the Year 1 Reporting Review process, input on the reporting process was gathered from members through a survey and stakeholder-specific meetings. This feedback will be used to inform revisions to the Reporting Matrix and disclosure requirements for reporting Years 2 and 3, aligning with the Transparent Reporting Roadmap (TRR).

The WG selected consultant Petra Westerlaan to propose a quantitative orientation for the reporting matrix and conducting a crosswalk with other established reporting frameworks such as CDP Forest, GRI, and ZSL-SPOTT. This quantification approach is expected to facilitate data aggregation and will make evaluating annual progress easier.

The Resolution for the Disclosure Requirements for Reporting Requirements has been finalised and is will be presented to the membership for voting. 

Lastly, quantification from Petra Westerlaan has been completed and the Working Group will embark on further consultations with the Working Group to prepare the updated Reporting Requirements to be approved at an extraordinary GA.

Shared Responsibility Working Group: The Shared Investment Mechanism (SIM) Resolution has been subsumed under the Assurance Model Resolution for approval in the 2023 GA, as a strong basis for further consultation and discussion after the GA. This is due to the integral role of the KPIs, which has not been finalised, in the implementation of the SIM. 

Value and benefits per category to be defined.

The Secretariat is looking into the development of guidance for the operation of the SIM.

Additionally, there is a co-chair seat open, and we are calling for interested volunteers.

News

GPSNR Working Groups Update: August 2024

Strategy and Objectives Working Group: Hubert has completed his updates to the Assurance Model documents, which are now being consulted with the membership through the Assurance Model Task Force. Members should provide written feedback through the feedback form, and those who wish to be more actively involved in finalising these documents are encouraged to write to the Secretariat to join the Task Force. Additionally, a webinar will be conducted to share these updates and initiate further feedback from the membership. To register for the webinar, click here.

Smallholders Representation and Capacity Building (SCB) Working Group: The following projects have been endorsed by SCB WG members: the Indonesia GAP Coaching (Phase 1) by Koltiva, and the Income Diversification and Rubber Agroforestry Project by Dr. Eric (CIRAD) and Dr. Maria. Continued oversight of ongoing projects, including the Indonesia GAP Coaching Project (Phase 2), is being maintained. Koltiva has submitted a mid-term report, with SCB WG members requested to review and provide feedback by 26 August 2024.

Goodyear has expressed interest in extending the Indonesia GAP Coaching Project into Phase 3, with Koltiva’s proposal currently under review by the funder and the Secretariat planning to circulate it to SCB WG members for review once finalised. The Knowledge Sharing Platform is on track, with Koltiva scheduled to deliver the outcomes by 20 August 2024 and a presentation to the SCB WG on 22 August 2024. The Thailand Agroforestry Project is proceeding smoothly, with the contract for an additional project to develop a local marketing system being finalised with RAFS. Additionally, the resolution on the Shared Investment Mechanism (SIM) was approved during the EGA in July 2024, and the Secretariat is facilitating the creation of a Project Management Sub-group within the SCB WG, which will be responsible for reviewing and monitoring projects under the SIM. The Terms of Reference (TORs) for this sub-group have been drafted and are pending approval from the GPSNR Executive Committee.

Shared Responsibility Working Group: The Shared Investment Mechanism has been approved by the General Assembly following the July Extraordinary General Assembly vote. The Secretariat will work on establishing the Shared Investment Mechanism and operationalising all aspects of the Shared Investment Framework. Additionally, the Secretariat will continue to develop the value transfer initiative through discussions with members.