Request For Proposal – GPSNR Annual Report Design (Animated Video and PDF formats)

Share This Post

Background

The Global Platform for Sustainable Natural Rubber (GPSNR) brings together companies, smallholders, academia, and civil society to transform the natural rubber supply chain into one that is sustainable, equitable, and fair.

Since its launch in 2018, GPSNR has grown into a truly global platform, now representing over half of the world’s natural rubber demand. Over the years, the platform has moved from building alignment and collaboration to establishing the systems that make collective impact possible.

2025 marks a pivotal shift in GPSNR’s journey.
This is the year in which the platform redefined what impact means, moving from engagement and small-scale contributions to systemic change through:

  • the approval and launch of an industry-wide sustainability assurance system

     

  • the mobilisation of funding through the Shared Investment Mechanism (SIM)

     

  • and a strategic focus on scaling impact in emerging markets 

The 2025 Annual Report will tell this story of growing ambition of a platform that has moved decisively into an era of assured, financed, and delivered impact.

 

Scope

GPSNR is seeking a creative consultancy or production partner to develop:

  1. A short-form Annual Report video (5 minutes)

     

  2. An accompanying Annual Report that can be published online and downloaded as a PDF

The video and report should work together as a cohesive storytelling package, communicating GPSNR’s strategic evolution and impact to members, partners, donors, policymakers, and the wider sustainability community.

All core content, messaging, and data will be provided by the GPSNR Secretariat. The consultant will be responsible for shaping this content into compelling visual narratives across both formats.

Core tasks

Working closely with the GPSNR secretariat, the consultant will: 

  • Propose 2–3 creative concepts for the overall narrative and visual direction of the Annual Report (video + PDF) for the GPSNR team to choose from 
  • The consultant will be responsible for scriptwriting and storyboarding, content production, video editing and post-production, and final delivery of a complete video package suitable for digital, event, and member communications.
  • Liaise with GPSNR’s Communications Manager to ensure the draft cuts are feasible. 

Terms 

  • The engagement will take place for a period of six weeks, from 26 January to 9 March. Interim dates for and approvals will be mutually agreed upon after confirmation. 

Necessary Competencies:

  • Proven experience producing annual reports or impact communications in video and digital formats
  • Strong capabilities in visual storytelling and narrative development
  • Experience working with:
    • sustainability, ESG, or multi-stakeholder initiatives
    • complex technical content and policy-related themes
  • High-level design and production skills, including:
    • motion graphics and video editing
    • layout and publication design
  • Ability to manage iterative feedback processes with multiple stakeholders
  • Strong attention to detail and quality control

Submission Guidelines:

The following submission guidelines & requirements apply to this Request for Proposal:

  • Proposals will only be accepted from individuals or firms with experience relevant to this project.
  • Submissions must include 1) a portfolio of previous work 2) a paragraph describing how the consultant would approach such a project 3) a financial proposal with a breakdown of how much each work would cost.
  • Proposals must be signed by a representative that is authorised to commit to the bidder’s company.
  • Proposals must be received by 19 January 2025 to be considered. Proposals should be submitted to bani.bains@gpsnr.org for consideration.
  • To receive a copy of the draft content, applicants can email bani.bains@gpsnr.org

RFP and Project Timelines

Submission of Proposal

19/01/2026

Selection of top bidders and further conversations

21/01/2026

Contract award/notification to unsuccessful bidders

22/01/2026

Work commences no later than 

26/01/2026


Budget

The Platform anticipates that a total budget of no more than 4,000 Singapore Dollars (SGD) will be allocated to this engagement.

    

Payment terms shall be:

20% at the signing of the contract

30% at the midpoint date to be agreed upon and memorialised in the contract based on the submitted work plan

50% on delivery of the final report

 

Evaluation Factors

GPSNR will rate proposals based on the following factors:

  • Responsiveness to the requirements outlined in this Request for Proposals
  • Relevant past performance/experience and / or any samples of past work
  • Cost, including an assessment of the total cost of ownership.
  • Technical expertise/experience of the bidder and the bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

More To Explore

Request For Proposal – GPSNR-RFP-A02-030-Risk Taskforce Traceability Pilot Field Trial – Indonesia

Introduction & Background

 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.

The Risk Subgroup of GPSNR is seeking a consultant/field team to identify, test, evaluate and report on what effort may be required for a rubber processor to map their supply shed (i.e., all the farms that they are sourcing from) in complex supply chains such as in Indonesia and Thailand. 

 

Objectives

The goal of the pilot is to investigate what effort (i.e., time, effort, cost, labour) may be required for a rubber processor to map their supply chain in complex supply chains such as Indonesia and Thailand.

The goal of this pilot is to map at least 300 small holder farmers supplying one processing mill each in Indonesia. The subgroup is open to negotiation on the total number of small holder farms mapped based on the service provider’s experience and estimation.

The service provider should work with the GPSNR Risk Subgroup and the participating processors from Indonesia and their dealers to:

  1. Keep track of time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each farm, and provide them to their GPSNR Point of Contact at the end of the survey.
  2. Register and map farmers using field-based mapping or in combination with remote sensing that is crossed checked with field-based mapping samples. The service provider is welcomed to use their own method.
    1. Collect and provide the shapefiles from the mapping at the end of the project to the point of contact and the participating processor.
  3. Ask farmers to answer the RubberWay questionnaire.
  4. Ask farmers to answer the HCVRN Nature Positive Farming questionnaire.
  5. Unless automatically uploaded, submit farmers’ responses to the respective databases and the GPSNR point of contact at the end of each day for compilation.
  6. Record the effort required to convince 300 farmers per processing mill to complete all 3 tools.
    1. Number of dealers and farmers contacted to identify 300 farmers willing to participate in study.
    2. Total person hours required to identify 300 willing suppliers.
    3. Details of incidental (not staff time) expenses required to identify 300 willing farmers.
  7. Record the effort required/difficulty to convince the super dealers/suppliers to participate in the study, based on the supplier tiers & on the pilot sample goal.
    1. Skip Tier 1 farms
    2. Not more than 100 responses from Tier 2
    3. 200 responses from Tier 3 and 4 suppliers

Scope of Work

  • Field data collection has to be completed by the second month from the starting date of the project.
    • Ideally, field teams are experienced in 2 or more of the above tools (RubberWay questionnaire, HCVRN Nature Positive Farming questionnaire and field-based or remote sensing-based mapping), else training will be provided. Please indicate which tools your team is experienced in using we will provide the necessary training.
      • If remote-sensing based is preferred by the service provider, please respond with the process and note that the data has to be cross-checked with field-based samples.
    • Field teams have to be able to speak the local language at each survey location(i.e., Bahasa Indonesia).
  • GPSNR estimates the necessary activities per farm and the time required to conduct them to be as follows:
  1. Explain purpose of visit (~15 mins)
  2. Get permission for personal data collection to ensure data protection (~5mins)
  3. Map farm via mapping based on the mapping method chosen by the service provider (e.g., field-based mapping or remote sensing cross-checked with field samples) (~90mins).
    1. Mapping for farms <4 hectares:
      1. Polygon mapping or GPS mapping is up to the discretion of the service provider.
    2. Polygon mapping for farms above 4 hectares:
      1. This is based on the EU regulation (see Annex A) that a polygon would be required for farmers over 4 hectares.
      2. At least 10% (~30 of the 300 farms must be polygon mapped)
    3. Fill in RubberWay questionnaire (~30mins)
    4. Fill in HCVRN Nature Positive Farming questionnaire (~30mins – 1 hour)
    5. Verify data before departure (~10mins)
  • GPSNR assumes:
    • Total time required: ~approximately 180 mins/3 hours per farm per field assistant.
    • Farms likely to be covered per day: 2 farms.
    • Total number of field assistant days required assuming 2 farms per day: 450 days
    • Total weeks required for 1 field assistant assuming 5 work days per week: 90 weeks
    • Total weeks required for two processors assuming 10 field assistants working simultaneously in one country: 9 weeks
    • This is an estimation of the time taken, we look forward to a comparison with the final recorded timings.
  • If you have other ideas on how to achieve the above objectives, please provide details about how you would design the study

Expected Deliverables

Specifically, GPSNR expects the consultant to:

 1. Map at least 300 farmers supplying to the participating processor in Indonesia and provide the shapefiles to the processor and the GPSNR point of contact.

a.      There should at least be 10% (~30 farms out of 300 farms) that are polygon mapped, based on the requirements mentioned above and in Annex A.

 2. We would like a detailed account of the time and resources spent on 1. travelling to the farm, 2. On the farm and 3. Data analysis

a.      We would like to see a breakdown of the total time spent in each component. E.g., Total reported time spent on 1 farm + 1 analysis = 8hours, within that 2 hour (time taken to travel to farm), 0.5 hours (convincing the farmer), 0.5 hours (communicating to farmer about the tool), 20 mins (Mapping the farms), 30 mins (HCVN questionnaire), 30 mins (Rubberway questionnaire)

 3. An evaluation of the merits and limitations of each tool

a.      E.g., 3/11 farmers surveyed were more apprehensive about the mapping tool due to fear of exposing their location.

 4. A recommendation of the scalability of this pilot

a.      Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

b.     E.g., $X/farm is calculated but is not scalable due to what reason(s).

Proposal Format and Contents

The proposal should include the following:

1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

2. The timeline and key stages of operations based on Project Timeline below

3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on Budget below

4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 10 March 2023 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and cheryl@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Project Timelines

 

Proposals submitted by consultant to stefano.savi@gpsnr.org

10 March 2023

Selection of consultant /
Notification to Unsuccessful Bidders

16 March 2023

Contract Award / Notification to Unsuccessful Bidders

17 March 2023

Initial methodology presentation and Q&A with subgroup

23 March 2023

Training sessions for tools 

Late March – Early April 2023

Update session with subgroup 

April 2023

Final Draft report and conclusion of project 

July 2023

 

Budget

The Platform is anticipating that a total budget of no more than €25,000 be allocated to this engagement.

Payment terms shall be:

·        20% at the signing of the contract

·        30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.

·        50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel
expenses, if deemed necessary by both the consultant and Secretariat, are
incurred and documented.

 

Evaluation Factors

 GPSNR will rate proposals based on the following factors, with cost being the most important factor:

1.        Responsiveness to the requirements set forth in this Request for Proposal

2.      Relevant past performance/ experience

3.      Samples of work

4.     Cost, including an assessment of total cost of ownership.

5.      Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

Annex

Annex A: EU Deforestation Regulation

‘geolocation’ means the geographical location of a plot of land described by means of latitude and longitude coordinates corresponding to at least one latitude and longitude point and using at least six decimal digits. For relevant commodities other than cattle, for plots of land of more than 4 hectares, the geographical location shall be provided using polygons, meaning sufficient latitude and longitude points to describe the perimeter of each plot of land.

Text obtained from Article 2: Definitions, point (29) of the Deforestation Regulation consolidated text dated 20/12/22Deforestation Regulation consolidated text 20-12-22


View RFP Document here

Tender

(CLOSED) Request for Proposal – GPSNR Compliance Panel Guidance (GPSNR-RFP-A02-014)

INTRODUCTION AND BACKGROUND

The Global Platform for Sustainable Natural Rubber is an international, multi-stakeholder, voluntary membership initiative committed to improving the socioeconomics and environmental performance of the natural rubber value chain.  Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018.  Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

The GPSNR Statutes mandate the creation of an independent Compliance Panel to review and ensure that Members meet GPSNR membership requirements in conformance with Statutes, Code of Conduct, decisions, standards and processes, and make recommendations to GPSNR Executive Committee. The Compliance Panel will administer decisions in line with relevant GPSNR procedures. The panel shall be composed of three external experts and will operate independently from the membership and Secretariat.

GPSNR is seeking a consultant to help define procedures and guidelines required for the transparent and impartial operations and activities of GPSNR Compliance Panel.

PHASE I: OBJECTIVES AND SCOPE OF WORK

Objectives: To review GPSNR Statutes and relevant procedures, and develop recommendations and propose options available for the structure, operations and verification protocols of the Compliance Panel. 

The current GPSNR membership statutes document stipulates the following: 

10. Compliance System and Compliance Panel. The Executive Committee shall establish a Compliance System to ensure that Members meet Platform membership requirements in conformance with the Platform’s Statutes, Code of Conduct, decisions, standards and processes. The operating procedures of the Compliance System shall be defined in terms of reference to be adopted by the Executive Committee, consistent with the following core provisions: 

a. The Compliance System shall be administered by the Secretariat. 

b. Recommendations and decisions under the Compliance System shall be made by a Compliance Panel. 

c. The Compliance Panel’s functions shall include the review of whether a Member (in the period after its admission) meets the requirements for membership. 

d. The Compliance Panel shall operate independently from the Executive Committee and General Assembly. 

e. The Compliance Panel shall be composed of an independent body of three external experts that meet on a regular basis. 

f. Experts shall be nominated by an Ordinary Member and elected by a decision of the General Assembly to serve a 3-year term. 

g. A Member of the Compliance Panel may be removed by a consensus decision of the Executive Committee with a clear justification available to members upon request. 

h. Members of the Compliance Panel shall be subject to a conflict of interest policy, as adopted by the Executive Committee. 

i. The Compliance System shall ensure that Members are afforded an opportunity to be heard and an opportunity to cure any findings of non-compliance, alleged by either the Compliance System or Grievance Mechanism. 

The consultant is expected to provide an outline of relevant existing compliance models, a comparison of options that GPSNR could consider, and justified recommendations based on: 

  • Review of other existing membership and/or compliance panel models  
  • Review of GPSNR Statutes and other relevant GPSNR documents  
  • Interviews with GPSNR members and relevant external stakeholders 
  • Other relevant expert advice and guidance 

Scope of Work:

GPSNR is seeking a consultant to recommend operational procedures and guidance for the GPSNR Compliance Panel, to include: 

  • Proposed roles and responsibilities of GPSNR Compliance Panel 
  • Suggested scope of the CP’s activities 
  • Recommended qualification requirements and selection protocols for Compliance Panel members; covering necessary relevant expertise, how to avoid conflict of interests, and procedures for the appointment and removal of Panel members  
  • Options for the structure of decision-making within the panel 
  • Proposed verification procedures by the panel to assess ongoing compliance of GPSNR members with membership requirements 
  • Procedure for issuing appropriate recommendations to ensure compliance of GPSNR members, based on the submitted results of the verification process.  
  • Options for GPSNR to deal with situations where members cannot demonstrate compliance with relevant membership requirements, including steps towards potential suspension or termination in cases of major or persistent noncompliance 
  • Suggestions for appeal procedures related to the decisions/recommendations of the GPSNR CP 
  • Procedure for recording and reporting of Compliance Panel decisions/recommendations  

PROPOSAL FORMAT AND CONTENTS

  • Description of past work that is relevant to this RFP. 
  • A workplan that outlines all key activities of the pilot study, cost for each and timeline for completion. 
  • A description of deliverables and indication of accessibility to GPSNR members and/or the public.  
  • A list of project team members with their roles in the project and associated qualifications. 

TERMS

The work shall begin by 21 May 2021 and the various phases shall be completed in accordance with the dates outlined in the timeline below: 

Activity  Due Date 
Submission deadline for proposals  7 May 2021 
Contract Award  14 May 2021 
Work begins  By 21 May 2021 
Presentation of first draft to GPSNR Policy Toolbox WG (WG1)  2 June 2021 (adjustable) 
Review of draft based on WG1 feedback  3-10 June 2021 
Submission of final recommendations   11 June 2021 

BUDGET

The Platform is anticipating that the total budget of no more than 10,000 SGD be allocated to the engagement. 

Payment terms shall be: 

  • 20% at the signing of the contract 
  • 30% at the presentation of the first draft 
  • 50% upon delivery of the final recommendations. 

EVALUATION FACTORS

GPSNR will rate proposals based on the following factors, with cost being the most important factor: 

  1. Responsiveness to the requirements set forth in this Request for Proposal; 
  2. Relevant past performance/experience; 
  3. Samples of work; 
  4. Cost, including an assessment of total cost of ownership; 
  5. Technical expertise/experience of bidder and bidder’s staff. 

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion. 

Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration.

Scroll to Top