Shared Investment Mechanism: Call for Project Proposals 2026

Share This Post

As we prepare for the next cycle of the GPSNR Shared Investment Mechanism (SIM), we are pleased to announce that the call for project proposals and in-kind contributions for 2026 is now open.

Submission Period: 20 March – 31 May 2025

Deadline: Proposals and applications must be submitted by 23:59 SGT on 31 May 2025. Late submissions will not be accepted.

Background

The GPSNR Shared Investment Mechanism (SIM) is a joint-funding framework where GPSNR Manufacturer Members contribute to capacity-building or sustainability projects through direct funding or in-kind contributions.

Call for Project Proposals

This is for organizations that want to submit project proposals to be considered for funding through SIM’s direct funding route. Approved projects will be shared with Manufacturer Members for review and potential funding.

 

How to Submit:

 

 -Download the required documents:

o GPSNR SIM Project Proposal Template_V3.docx

o  GPSNR SIM Project Budget_V1.xlsx

 

-Complete the Project Proposal Template and Project Budget Template.

 

-Send your completed documents to cheewei@gpsnr.org with the subject line: [SIM 2026 Proposal Submission] – [Project Name]

 

Please read the FAQ for call for project proposals here: FAQ – Call for Project Proposals_V3.pdf

 


For any questions or clarifications, please contact
cheewei@gpsnr.org

More To Explore

News

Strategy and Objectives Working Group Update – December 2019

The final version of Desired State V1-0 and Theory of Change will be submitted to the Executive Committee in view of approval at the General Assembly on 31st March 2020.  The Strategy & Objectives Working group is also preparing a concept of Equity working sub-group. GPSNR calls for members who wish to support in preparing the concept note for the equity sub-group, to please state your interest to GPSNR secretariat. 

Strategy 1 ‘Policy Toolbox’ Working Group drafters proposed the first draft of the policy elements and KPIs to the working members, which have now been mapped out against GPSNR 12 principles and desired state.  In order to collect the comments in a written form, members are asked to provide their comments online by January 3rd 2020. After the working group members agree on the final version of policy components, it will be submitted to the Executive Committee for comments and approval.

Strategy 2 ‘Capacity Building’ Working Group has completed a validation of their strategy against the Theory of Change.  The Working Group realizes that the situation in each country varies, so the capacity building strategy needs to be customized in its approach.  A list of stakeholders conducting capacity building activities in rubber producing countries has been finalised. The next step will be to collect inputs from the identified stakeholders in order to design GPSNR capacity building strategies.  In order to have a standardized information, the interviews will be conducted by GPSNR members in January 2020, and the result of the interview will be consolidated by GPSNR secretariat.

Strategy 3 ‘Traceability and Transparency’ Working Group – Some of the tools that the members are using for natural rubber traceability and transparency were presented during the first calls.  The next step is to start looking at Theory of Change, what are the underlying cause of lack of transparency and traceability, and how increasing transparency will contribute to the desired state.

GPSNR members can see the discussion and the minutes of each working grouop on GPSNR discussion forum. Please contact nigel@gpsnr.org for your log-in credentials.

PUBLIC CONSULTATION: GPSNR OPERATIONAL GUIDANCE FOR EUDR IN THE NATURAL RUBBER SUPPLY CHAIN

Public feedback is currently closed and under review 

The Global Platform for Sustainable Natural Rubber has prepared three guidance documents to support GPSNR members in their efforts to comply with the upcoming European Union Deforestation Regulation. 

The Platform is now conducting a 30-day public consultation on these documents. After the consultation, a multi-stakeholder task force within the Platform will review the comments, make the necessary changes, and send these documents for endorsement by the Executive Committee.

Any feedback on the documents should be added by 15th May 2024.

The final version will be publicly available once all the feedback has been incorporated. 


Add your feedback here before 15 May 2024

Scroll to Top